Ningbo Yinzhou Longda Machinery Parts Factory
Main products:Hydraulic Cylinder,Piston,Auto Parts,Casting,Forging Parts
Products
Contact Us
  • Contact Person : Ms. Ren JingJing
  • Company Name : Ningbo Yinzhou Longda Machinery Parts Factory
  • Tel : 0086-574-88473087
  • Address : Zhejiang,Ningbo,Duogu Industry Zone,Yunlong Town, Ningbo,Zhejiang,China
  • Country/Region : China
  • Zip : 315135

Stainless Steel Piston Head

Stainless Steel Piston Head
Product Detailed
Stainless Steel Piston Head 1.Used for hydraulic cylinder 2.Material: stainless steel, SS2172,ST52 3.Piston guage:M75*2

Hydraulic Cylinder Piston Parts Details:

1).  Piston parts are used in hydraulic cylinder, auto car, racing car, farm machinery, construction machinery, transportation parts and so on.

2).  All seals are manufactured to US specification.

3).  Piston Finish: Fe/Zn Bright chromating min 25μ ,Thermal treated, rust prevents, ting oil, hot galvanization, cold galvanization, powder Coating and so on.

4).  Material Available: Ductile iron QT450, ASTM A536 65-45.12, ASTM 8620, ASTM 8630, ASTM A148 grade 90-60, ASTM A216 70-36 grade WCB, C1018, C1020, C1045, 304 SST, Z2CN18.10, X20Cr13, 9SMnPb28k, 11SMnPb30, X2CrNi18-9, aluminium6061-T6, 6463-T6, 7075-T6 and so on

5).  Quality Approvals: all pistons are subjected  to 3 phases of through inspection using qualified instrument before dispatching.

 

Process Flow Chart:

   

Our Slogan: regarding the quality as the factory's life 

We are: 

1.  Real factory with about 20 year’s history and are licensed to export, providing competitive price. 

2.  Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc. 

3.  Quality Certificates:  ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL. 

4.   Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc. 

5.   Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching. 

6.  MOQ: 10pcs. Production capacity: 100000pcs/month 

7.  The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable 

8.  Delivery Time: about 20 days by the sea transportation. 

9.  The sea port of the shipment: Beilun Ningbo Zhejiang province

 



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.